Objective:
Increase the numbers of large brown trout (>16 inches) by improving stream conditions on 1,960 ft of stream. Reduce stream sediment load from reduced bank erosion and improved stream channel geomorphology.Description:
This project included -- Rip-rapping of stream banks
- Sloping of stream banks
- Installation of structures for overhead cover
- Installation of erosion control blankets
- Mulching and seeding with native vegetation